To most of our customers, it's imperative that the transformer functions correctly. But it's also crucial that it looks like new.

At Jerry's Electric, we do the following:

 
  • Sand all transformers. If rust is present, the unit is sand-blasted to bare metal.

  • Pressure-wash all transformers to remove dust and other impurities that may affect the painting process.

  • Air-dry all transformers. We mask the bushings and switches prior to painting.

  • Apply a primer paint coat of at least 1.5 mils thick.

  • Apply a final coat with an electrostatic spray gun using an acrylic enamel paint. The paint is 1.5 mils in thickness.

  • Apply a rubberized undercoating to each padmount transformer with a minimum thickness of 7 mils. The undercoating covers the bottom and 4-8 inches up each side of the transformers.
  • Home | Products & Services | Inventory Ready to Ship | Technical Support News & Events | Image Gallery | Quality | About Jerry's | Contact Jerry's
    © Copyright 2010, Jerry's Electric.